⚡ BidWaiver Pro · Create state-compliant Lien Waivers, Good-Better-Best customer estimates, and signed Change Orders in 60 seconds.
⚡ FLORIDA STATUTE: FLA. STAT. § 713.20(4) & (5)

Florida Construction Lien Waiver & Release Generator

Florida Statutes § 713.20(4) (Progress Payment) and § 713.20(5) (Final Payment) establish the statutory lien waiver forms. Under Florida law, a person may not require a lienor to furnish a lien waiver or release in a form different from the statutory form. Notary rule: No (Notarization not required by statute, though parties cannot be forced to sign a non-statutory waiver). Generate your Florida Conditional or Unconditional Progress/Final Payment Waiver below.

STEP 1 — LIEN WAIVER GENERATOR

Create Your State Lien Waiver in Seconds

Pick your state, enter the payment amount, and print or copy your ready-to-sign waiver.

Live Lien Waiver Preview

🔑 Unlock Unwatermarked Pro Waiver Pass ($49/yr) Jump to Good-Better-Best Estimate Studio ↓
STEP 2 — 3-OPTION ESTIMATE & CHANGE ORDER PAD

Build a Good-Better-Best Proposal & Mobile Change Order

Pick your trade preset, enter labor and material costs, and get 3 customer pricing options with true profit margins.

Mobile Jobsite Protection · Never Perform Unapproved Extra Work

Jobsite Change Order Builder & Touch Signature Pad

Capture instant homeowner or General Contractor approval on your phone or tablet before starting extra work, unforeseen remediation, or code upgrades.

BidWaiver Pro Pass & Unwatermarked Document Export

Unlock Unwatermarked Proposals, Change Orders & 12-State Lien Waivers

Skip $169–$398/month ServiceTitan or Jobber lock-in. Purchase the Annual Contractor Pro Pass ($49/yr) via Gumroad (Merchant of Record) and unlock unlimited unwatermarked PDFs and bilingual EN/ES field documents.

BIDWAIVER PRO · CONTRACTORS & SUBCONTRACTORS

BidWaiver Pro — Estimates, Change Orders & Lien Waivers

Unlocks unlimited unwatermarked 3-Tier Good-Better-Best Customer Proposals, Mobile Signed Change Orders, and all 4 Statutory Lien Waiver forms across CA, TX, FL, AZ, NV, MI, GA, MS, MO, UT, WY, MA + 38-State Universal Waivers.

$49 USD Annual Solo Contractor Pass / $69 USD Multi-User Crew Pass
Unlock BidWaiver Pro Pass ($49 / $69) →

Already Purchased? Activate Your Pro Pass

Already purchased? Enter the license key from your email receipt to instantly remove watermarks and unlock clean PDF, PNG & CSV exports:

12 Mandatory Statutory Lien Waiver States (2026)

State Lien Waiver Rules & Notary Guide

In these 12 states, using a generic or non-statutory lien waiver form renders the waiver legally void and unenforceable.

State Governing Statute Notarization Required? Preliminary Notice Rule Dedicated State Generator
California (CA) Cal. Civ. Code §§ 8132, 8134, 8136 & 8138 No (Notarization NOT required; statutory wording must be substantially verbatim) California 20-Day Preliminary Notice (Civ. Code § 8200) Open California Generator →
Texas (TX) Tex. Prop. Code § 53.284 (HB 2237) No (Texas HB 2237 eliminated the mandatory notarization requirement for lien waivers signed on or after Jan 1, 2022) Texas Monthly Fund-Trapping Notice (15th day of 2nd/3rd month) Open Texas Generator →
Florida (FL) Fla. Stat. § 713.20(4) & (5) No (Notarization not required by statute, though parties cannot be forced to sign a non-statutory waiver) Florida Notice to Owner (NTO) within 45 days of first furnishing Open Florida Generator →
Arizona (AZ) A.R.S. § 33-1008 No (Notarization not required) Arizona 20-Day Preliminary Notice (A.R.S. § 33-992.01) Open Arizona Generator →
Nevada (NV) NRS 108.2457 No (Notarization not required) Nevada 31-Day Notice of Right to Lien (NRS 108.245) Open Nevada Generator →
Michigan (MI) MCL § 570.1115 No (Notarization not required for waiver; Sworn Statements require notarization) Michigan Notice of Furnishing within 20 days Open Michigan Generator →
Georgia (GA) O.C.G.A. § 44-14-366 (SB 315) No (Attestation by witness required; SB 315 clarified 90-day Affidavit of Nonpayment window) Georgia Notice to Contractor within 30 days Open Georgia Generator →
Mississippi (MS) Miss. Code Ann. § 85-7-419 No (Witness attestation recommended; 90-day Affidavit of Nonpayment rule applies) Mississippi Pre-Lien Notice within 30 days Open Mississippi Generator →
Missouri (MO) Mo. Rev. Stat. § 429.005 Yes (Missouri Residential Unconditional Final Lien Waivers are frequently notarized for title company clearance) Missouri 10-Day / 60-Day Pre-Lien Notice Open Missouri Generator →
Utah (UT) Utah Code § 38-1a-802 No (Notarization not required) Utah State Construction Registry (SCR) Preliminary Notice within 20 days Open Utah Generator →
Wyoming (WY) Wyo. Stat. § 29-10-101 Yes (Wyoming statutory lien waivers include a mandatory Notary Acknowledgment block under Wyo. Stat. § 29-10-101) Wyoming Preliminary Notice of Right to Lien within 30 days Open Wyoming Generator →
Massachusetts (MA) M.G.L. c. 254 § 32 No (Notarization not required) Massachusetts Notice of Contract / Notice of Identification (30 days) Open Massachusetts Generator →
Universal 38-State Waiver (NY, IL, WA, CO, PA, OH, NC, VA, NJ & All Other States) (UNIV) AIA-Compatible Common Law & Prompt Pay Statutory Standard (38 Non-Statutory States) No (Optional Notary Block included for Title / Lender Draw Requests) State-specific Preliminary Notice / Notice to Owner Open Universal 38-State Waiver (NY, IL, WA, CO, PA, OH, NC, VA, NJ & All Other States) Generator →
Contractor Legal & Margin FAQ

Frequently Asked Questions — Lien Waivers & Contractor Bids

What is the statutory citation for construction lien waivers in Florida?

In Florida, construction lien waivers are governed by Fla. Stat. § 713.20(4) & (5). Florida Statutes § 713.20(4) (Progress Payment) and § 713.20(5) (Final Payment) establish the statutory lien waiver forms. Under Florida law, a person may not require a lienor to furnish a lien waiver or release in a form different from the statutory form.

Does a Florida lien waiver require notarization in 2026?

No (Notarization not required by statute, though parties cannot be forced to sign a non-statutory waiver). Preliminary notice requirement: Florida Notice to Owner (NTO) within 45 days of first furnishing.

What is the difference between a Conditional and Unconditional Lien Waiver?

A Conditional Waiver and Release only becomes legally effective once the check or ACH payment has actually cleared the bank. An Unconditional Waiver immediately extinguishes your mechanic's lien and payment bond rights upon signing—even if the check later bounces or the wire is never sent.

What is the difference between Contractor Markup and Gross Profit Margin?

Markup is the percentage added on top of direct job cost, whereas Gross Margin is the percentage of the final selling price that is gross profit. A 50% markup on a $1,000 job yields a $1,500 price ($500 profit = only 33.3% gross margin). To achieve a true 50% gross margin on a $1,000 job, you must divide $1,000 by (1 - 0.50) = $2,000 (a 100% markup).