⚡ BidWaiver Pro · Create state-compliant Lien Waivers, Good-Better-Best customer estimates, and signed Change Orders in 60 seconds.
⚡ MOBILE TOUCH SIGNATURE PAD · REVISED CONTRACT CALCULATOR

Construction Change Order Template & Mobile Touch Signature Builder

Never perform extra work, hidden structural remediation, or code upgrades without a signed Change Order. Calculate the revised contract total, document schedule extensions, and capture the client's finger signature on your phone.

STEP 2 — 3-OPTION ESTIMATE & CHANGE ORDER PAD

Build a Good-Better-Best Proposal & Mobile Change Order

Pick your trade preset, enter labor and material costs, and get 3 customer pricing options with true profit margins.

Mobile Jobsite Protection · Never Perform Unapproved Extra Work

Jobsite Change Order Builder & Touch Signature Pad

Capture instant homeowner or General Contractor approval on your phone or tablet before starting extra work, unforeseen remediation, or code upgrades.

STEP 1 — LIEN WAIVER GENERATOR

Create Your State Lien Waiver in Seconds

Pick your state, enter the payment amount, and print or copy your ready-to-sign waiver.

Live Lien Waiver Preview

🔑 Unlock Unwatermarked Pro Waiver Pass ($49/yr) Jump to Good-Better-Best Estimate Studio ↓
BidWaiver Pro Pass & Unwatermarked Document Export

Unlock Unwatermarked Proposals, Change Orders & 12-State Lien Waivers

Skip $169–$398/month ServiceTitan or Jobber lock-in. Purchase the Annual Contractor Pro Pass ($49/yr) via Gumroad (Merchant of Record) and unlock unlimited unwatermarked PDFs and bilingual EN/ES field documents.

BIDWAIVER PRO · CONTRACTORS & SUBCONTRACTORS

BidWaiver Pro — Estimates, Change Orders & Lien Waivers

Unlocks unlimited unwatermarked 3-Tier Good-Better-Best Customer Proposals, Mobile Signed Change Orders, and all 4 Statutory Lien Waiver forms across CA, TX, FL, AZ, NV, MI, GA, MS, MO, UT, WY, MA + 38-State Universal Waivers.

$49 USD Annual Solo Contractor Pass / $69 USD Multi-User Crew Pass
Unlock BidWaiver Pro Pass ($49 / $69) →

Already Purchased? Activate Your Pro Pass

Already purchased? Enter the license key from your email receipt to instantly remove watermarks and unlock clean PDF, PNG & CSV exports:

Contractor Legal & Margin FAQ

Frequently Asked Questions — Lien Waivers & Contractor Bids

Which 12 US states mandate statutory construction lien waiver forms?

Twelve (12) US states mandate statutory mechanic's lien waiver forms by law: Arizona (A.R.S. § 33-1008), California (Civ. Code §§ 8132, 8134, 8136, 8138), Florida (Fla. Stat. § 713.20), Georgia (O.C.G.A. § 44-14-366), Massachusetts (M.G.L. c. 254 § 32), Michigan (MCL § 570.1115), Mississippi (Miss. Code § 85-7-419), Missouri (RSMo § 429.005), Nevada (NRS 108.2457), Texas (Tex. Prop. Code § 53.284), Utah (Utah Code § 38-1a-802), and Wyoming (Wyo. Stat. § 29-10-101).

Does a Texas or California construction lien waiver need to be notarized in 2026?

No. California Civil Code §§ 8132–8138 does not require notarization. In Texas, HB 2237 amended Tex. Prop. Code § 53.284 to eliminate the notarization requirement for statutory lien waivers signed on or after January 1, 2022. Among the 12 statutory states, only Wyoming (Wyo. Stat. § 29-10-101) and residential final waivers in Missouri routinely require notarization.

What is the difference between a Conditional and Unconditional Lien Waiver?

A Conditional Waiver and Release only becomes legally effective once the check or ACH payment has actually cleared the bank. An Unconditional Waiver immediately extinguishes your mechanic's lien and payment bond rights upon signing—even if the check later bounces or the wire is never sent.

What is the difference between Contractor Markup and Gross Profit Margin?

Markup is the percentage added on top of direct job cost, whereas Gross Margin is the percentage of the final selling price that is gross profit. A 50% markup on a $1,000 job yields a $1,500 price ($500 profit = only 33.3% gross margin). To achieve a true 50% gross margin on a $1,000 job, you must divide $1,000 by (1 - 0.50) = $2,000 (a 100% markup).